by Talmadge Construction | Jun 20, 2014 | Uncategorized
Here is a statistic that gave us pause: fully 27% of Talmadge Construction’s 2013 income came fixing failed work done by others. In one instance, the sewer outflow of newly built home on the Summit was incorrectly connected to a footing drain, leading to a messy...